Gravel is quoted in tons and thought about in square feet, and that mismatch is where orders go wrong. One cubic yard of #57 crushed stone weighs about 1.4 tons and covers 108 square feet at three inches — so a modest driveway is several tons, not several bags.

Area Depth Area x Depth = Volume

By area at 3 inches deep

Area Cubic yards at 3 in Bags (0.5 cu ft) Weight
100 sq ft 1.02 cu yd 56 bags 1.4 tons
200 sq ft 2.04 cu yd 111 bags 2.9 tons
500 sq ft 5.09 cu yd 275 bags 7.1 tons
1,000 sq ft 10.19 cu yd 550 bags 14.3 tons
2,000 sq ft 20.37 cu yd 1,100 bags 28.5 tons

By depth, for 100 square feet

Depth changes the answer far more than most people expect. Doubling the depth doubles the quantity — the area stays the same.

Depth Cubic yards per 100 sq ft Bags (100 sq ft)
2 in 0.68 cu yd 37 bags
3 in 1.02 cu yd 56 bags
4 in 1.36 cu yd 74 bags
6 in 2.04 cu yd 111 bags

Worth knowing before you order

  • Driveways need 4 inches of compacted stone over a base; decorative paths are fine at 2 inches.
  • Compaction shrinks the volume by roughly 20 percent, so order for the loose depth.
  • Stone type changes the weight: #57 is about 1.4 tons per yard, #411 closer to 1.5.

Need a size that is not in the table? Use the gravel calculator — it handles rectangles, circles, triangles and L-shapes, and switches between feet and metres. For the per-yard and per-bag conversions, see the Gravel coverage chart.

Frequently asked questions

How much gravel do I need for 100 square feet?

At 3 inches deep, 100 square feet needs 1.02 cu yd — that is 56 bags at the 0.5 cu ft size, weighing about 1.4 tons.

How much gravel do I need for 1,000 square feet?

At 3 inches deep, 1,000 square feet needs 10.19 cu yd, which is 550 bags and roughly 14.3 tons.

How much gravel do I need for 2,000 square feet?

At 3 inches deep, 2,000 square feet needs 20.37 cu yd — 1,100 bags, about 28.5 tons. At that volume, bulk delivery is almost always cheaper than bags.

Should I order extra?

Yes — these figures already include a 10% allowance for uneven depth and edges. If your ground is very uneven, or the job involves several separate beds, round up one more step.